How to lay paving slabs: step-by-step recommendations for self-taught craftsmen

We bought a dacha, in principle, not bad, with a solid house and a well-groomed plot. The only drawback is that there is no covering in the yard, in the sense that the grass just grows. On the one hand, it is beautiful, but after rain, especially in late autumn, it is not very comfortable. We decided to lay out at least tile paths in order to walk. Tell me how to lay paving slabs? Do I need some kind of foundation for it?

how to lay paving slabs Concreting and laying asphalt in the courtyard are gradually becoming a thing of the past, giving way to tiles. Its advantages are obvious, because such a material is more environmentally friendly and durable, since it better tolerates the influence of weather conditions and temperatures. In addition, the tile costs an order of magnitude cheaper and there is a place for imagination to roam. You can choose any color and shape you like, and it will not be difficult even for a novice master to mount entire stained-glass windows. However, in order for the paths to serve for many years, it is important to follow the rules on how to lay paving slabs. Errors made during the preparation of the site and laying, not only affect the appearance of the coating, but can also reduce its service life..

So, the whole installation process can be divided into 3 stages:

  1. The choice of material depending on the purpose of use.
  2. Preparation of the site (base) for laying tiles.
  3. Directly laying the tiles.
  4. Finishing part – grouting.

Let’s consider each point in detail.

Selection criteria for paving slabs

paving slabs There are many variations of tiles: they can be squares, rectangles and even curly elements. You can buy one-color tiles, or combine several colors by laying out a drawing. These parameters depend only on desires.. But the thickness of the tiles must be chosen depending on the purpose of the site, namely:

  • for garden and pedestrian paths, thin tiles up to 4 mm thick are suitable;
  • for facing the entrance in front of the house and a place for a car, thicker tiles (5 mm) will be needed;
  • if a loaded truck will move around the site, a 6 mm thick tile is needed.

In private households, rectangular tiles (bricks) are most often used. It is easy to install and you can create any variation, especially in the color scheme..

Site preparation for laying

To keep the track strong and not creep, it is important to properly prepare the soil:

  • first of all, outline future paths, pulling the rope evenly around the perimeter;track markings
  • remove the top layer with vegetation, choosing roots and stones, and tamp the bed;site preparation
  • if desired, install and concrete curbs on both sides;installation of curbs
  • level the base by filling in the bearing layer of crushed stone or gravel (up to 2 mm).

If you additionally spread geotextiles under the rubble, the path will not be washed out from below with water, moreover, grass will not sprout from the seams. Some craftsmen also cover the second layer of material on top of the gravel, before filling in the sand..

The very base for the tiles can be of three types:

  1. Sandy. A leveling layer of sand with a thickness of at least 30 mm is poured onto crushed stone or gravel. It needs to be moistened from a spray bottle, allowed to dry a little and leveled by tamping.sand base
  2. Cement and sand. Are laid in layers: gravel, sand, reinforcing mesh (or without it), cement-sand mixture (4: 1).cement-sand base
  3. Concrete. In areas with weak soil, the bottom of the bed is poured with a concrete screed. But, although it strengthens the base, at the same time it retains water. In winter, in frosts, such a track can be deformed.concrete base

How to install paving slabs?

The tiles should be started to be laid away from you in order to move along the already finished path. You cannot walk on a leveled sand base. It is better to lay it diagonally – on flat paths, and from the center in a circle – on circular paths. The tile is installed on the base and fixed by knocking with a special rubber hammer. If it falls through, sand is added, if it protrudes too much, a little base is removed.laying tiles

Styling can be both chaotic and artistic, with the creation of a pattern. Geometric shapes laid out with multi-colored tiles also look beautiful..

There must be at least 2 mm gaps between the tiles – water will drain through them after rain. In addition, do not forget about drainage: laying on a concrete screed should be carried out at an angle or with the installation of special drainage pipes along the curb..

Grouting

groutingThe final stage of laying the track is the sealing of the joints remaining between the tiles. To do this, cover the path with fine sand and scatter it with a brush. Another layer of sand is poured on top and again rubbed over the surface until all the gaps are filled. At the end, the tiles must be poured abundantly with water..

Step-by-step laying of paving slabs – video

Previous Post
Cucumber face mask at home – the benefits and results of application
iphonevideorecorder.com
mgcool.cc
deadmansbones.net
fearlesslycreativemammas.com
thefunky-monkey.com
openssi.org